Bulgartransgaz EAD informs all interested parties that the Contract for Access and Natural Gas Transport through Bulgartransgaz EAD gas transmission networks with the General Terms and Conditions thereto

Chiren Underground Gas Storage is already filled to 90.24% of the technical storage capacity.

The commercial interest in the conducted non-binding phase of the market test for interconnection points along the Vertical Corridor is extremely high

At DESFA and BULGARTRANSGAZ, we are dedicated to driving the energy transition and achieving a sustainable future.

The Executive Director of Bulgartransgaz EAD Vladimir Malinov participated in an organized visit to the shipyard of Keppel Corporation in Singapore

By October 1, 2026 the Vertical Corridor’s infrastructure on Bulgarian territory will be completed, and the increased capacity will be available at the next annual auction

Bulgartransgaz EAD reminds all users of the gas transmission network with concluded Access and Transport Contract together with its General Terms and Conditions

Regarding the necessity to provide gas for technological needs of the gas transmission system

Parameters under art. 25 of Daily imbalance and neutrality charge calculation methodology valid for gas year 2024/2025

Chiren underground gas storage facility is now over 90% full of its technical storage capacity.